Piles at Mason's Yard site, Central London

Piling Design

Saltash, Cornwall

AGE carried out the design of the temporary works for a new stormwater storage tank built adjacent an existing pumping station. Click here for case study.

Azure Project, Plymouth

Rock bolt revetment and slope stabilisation together with a propped contiguous bored piled wall was designed by AGE to allow excavation and development of a site adjacent a six story hotel. Click here for case study.

Worsborough

A scheme to accommodate two large aeration lagoons on a small site with poor ground conditions was devised by AGE for a design and construct project to redevelop Yorkshire Water's sewage treatment plant at Worsborough. Click here for case study.

Euston Road, London

Checking of pile design for new office extension and design for hand dug caissons.

Essex

Design of foundation piles to abutments and piers to new motorway overbridges.

Woofferton, Shropshire

Design of abutment foundation piles for railway overbridge.

Trevisco, Cornwall

Pile design for remedial strengthening to house overlying a subterranean void.

Chelsea, London

Design of piled foundations to high boundary fencing.

Padstow, Cornwall

Design of foundation piles to hotel extension.

Mayfair, London

Design of structural piling inclusive of anti-flotation piles and design and detailing of reinforced concrete walling beam and slab.

Livingston

Design of axially loaded bored piles to support a new mezzanine floor.

Waterlooville, Hampshire

Design of bored piles to CCTV bases.

Newham, London

Design of CFA piles to university accommodation inclusive of pile test analysis.

Gateshead, Tyne & Weir

Analysis and advice on piling dispute.

Stoke on Trent, Staffs

Expert report covering retaining wall dispute.

Alexandria, Egypt

Advice to main contractor on performance of piling sub-contractor. Analysis of pile test data and driving records.

Richmond upon Thames

Expert report covering construction dispute.